Archives

Recent Comments

  • Scott Carle on: s/v Valkyr: Hawse Pipe Repair
  • timbalfour on: s/v Valkyr: Hawse Pipe Repair
  • Scott Carle on: s/v Valkyr: Hawse Pipe Repair
  • Eolian on: Martin Samuel's Bermuda trip report: DE38 Eclipse
  • Scott Carle on: Stories of s/v Valkier, DE38: All the shit that accumulates #2 by Scott Carle
  • Eolian on: Stories of s/v Valkier, DE38: All the shit that accumulates #2 by Scott Carle
  • Scott Carle on: Stories of s/v Valkier, DE38: All the shit that accumulates by Scott Carle

Hard Dodger on SHANGRI LA


Hard Dodger on SHANGRI LA – Michael Homsany, Kendra Pinsker

Design goals were for the dodger to have a removable top, be dry and comfy, strong enough to take a large wave, hold the solar panels, collect water and for the lines to flow into the lines of the DE.  Time will tell on the strength, it is dry and comfy, and collects water well. The lines are in the eye of the beholder, but it looks ok to me (I can see it finished).
Footprintoutlinedondeck

Footprint outlined on deck

Layingoutfooter

Laying out footer

Footergluedondeck

Footer glued on deck

Layingupsides

Laying up sides (construction braces removed later)

Roofliprabbe

Roof lip rabbeted to beams

Sideswithcornerbeams1

Sides with corner beams & fixed roof beam

Cuttinginroofbeams

Cutting in roof beams

clamped_roof

Aft view of clamped roof

download

View from forward

Send article as PDF to PDF Download